Place of Origin:
China
Brand Name:
HYF
Certification:
ISO, SGS, etc.
Model Number:
HYF
30mic-60mic Plastic Heat Shrinkable Blown PVC Film Rolls For Bottle Sleeves
1. Product Information
Product name | Plastic Shrink Wrap Film Rate Packaging Blown PVC Shrink Film Color Shrink Film |
Materials | PVC |
Color | Customized |
Width | 350-1000mm |
Thickness | 30UM-70UM |
Size | Customized |
Usage | Packaging Film |
Process | Blowing Molding |
Shrinkage | TD:20-53% MD:0-5% |
Tensile Strength | LMD:≥42MPA Transverse TD≥50MPA |
Elongation At Break | Longitudinal MD≥70% Transverse TD≥50% |
Tear Strength | Longitudinal MD≥60KN/M Transverse TD≥45KN/M |
Luminousness | ≥90% |
Package | Wooden Pallet |
Delivery Time | 15-25days |
2. Specifications
1. Thickness: 30-70 mic
2. Width: 350-1200mm
3. TD:48%-52% MD:0-10%
4. Length:1500m-3000m
5. No of Joint Seam: No more than 1
3. Features
1) High transparency
2) High strength
3) High Gloss
4) Shrink easily and nice shrinking result
5) Low shrinking temperature
6) Excellent for machine printing
7) Good for damp-proof, dust-proof and shocking resistance
4. Technical Data Sheet
NO. | Properties | Unit | Test Standard | Test Method | |
1 | Width | mm | (Order Sheet standard)0-3 | --- | |
2 | Thickness Max tolerance | % | ±12% | ASTM D 374 | |
3 | Tensile Strength | MD | N/mm2 | ≥42 | ASTM D 882 |
TD | N/mm2 | ≥50 | ASTM D 882 | ||
4 | Elongation at Break | MD | % | ≥70 | ASTM D 882 |
TD | % | ≥50 | ASTM D 882 | ||
5 | Shrinkage | MD | % | Order Sheet standard±2.5 | ASTM D 1204 |
(100°C,8 Seconds) | TD | % | Order Sheet standard ±2.5 | ASTM D 1204 | |
6 | Friction Coeffcient | --- | ≤0.5 | ASTM D 1894E |
5. Product Application
Various external package require shrinkable function, like bottle labels, battery labels, stationery and cosmetic labels, and PVC shrinkable film for various shrinkable wrapping bags.
6. FAQ
Q: 1. Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
Q: 2. What is the lead time?
A: Sample needs 2-3 days prepared; mass production time needs 15-20 days normally.
Q: 3. Do you have any MOQ limit?
A: Our MOQ is 1Tons;
Sea Port: Wuhan/Shanghai
Q: 4. How do you ship the goods and how long does it take arrive?
A: We usually ship by LCL or FCL by sea or air shipment.
The delivery time according to your quantity.
Q: 5.What information should I let you know if I want to get a quotation?
A: The external size of your products(Thickness x Width x Length)
The quantity.
Send your inquiry directly to us